test

Test Process

Objectives

  • Verify if module respect all rules and specifications

Pre-requisites

  • JAVA code is implemented

Inputs

  • JAVA Code
  • Webservices
  • Samples documents
  • Gazelle Platform

Actions

    • Unit Test
      • Static analysis
      • UT Generation and verification

      Test Process

      Objectives

      • Verify if module respect all rules and specifications

      Pre-requisites

      • JAVA code is implemented

      Inputs

      • JAVA Code
      • Webservices
      • Samples documents
      • Gazelle Platform

      Actions

        • Unit Test
          • Static analysis
          • UT Generation and verification

          Test Process

          Objectives

          • Verify if module respect all rules and specifications

          Pre-requisites

          • JAVA code is implemented

          Inputs

          • JAVA Code
          • Webservices
          • Samples documents
          • Gazelle Platform

          Actions

            • Unit Test
              • Static analysis
              • UT Generation and verification

              Based on registration, participants to the connectathon need to perform a series of test in order to be successful. Some of the tests need to be performed ahead of the connectathon and some need to be performed during the connectathon.

              Preparatory (pre-Connectathon) Testing

               All participants are required to run a series of software tests in advance of the Connectathon. These tests, typically done with tools provided by IHE, are designed as auditing tests to make sure you have prepared in advance; these are not full test suites or certification tests for a profile.

              Testing Session Management

              Gazelle Test Management can handle multiple testing sessions. The Multiple Test session can be run in parallel.  Monitor and Systems register for specific testing session. One can select the coverage of the testing session in terms of Domain and/or Profile. One can also specify the type of testing to be performed in a testing session : Pre-Connectathon, Connectathon, Certification.

              Subscribe to RSS - test