AIR_Test_Data

Overview

The AI Results (AIR) Profile requires the Image Display to demonstrate specific display capabilities when rendering AI Result SRs.  These requirements are in Display Analysis Result [RAD-136].

At the Connectathon, a monitor will sit down at your AIR Image Display and run through a set of tests to evaluate the display requirements in [RAD-136].

In this preparatory test, we are providing you with some test data advance of the Connectathon that you will use to demonstrate AIR display requirements.   The test data includes:

  • binary DICOM Structured Reports (SRs) that encode the AI result examples documented in RAD TF-3, Appendix A Example Analysis Result Encodings (currently in the AIR Trial Implementation Supplement).
  • vendor samples from prior IHE Connectathons

NOTE:  During the Connectathon, the Image Display will be required to perform tests with with AI Result IODs from the Evidence Creator test partners at that Connectathon.  The Image Display may also be asked to use AI Result IODs in this test data, especially where this sample data contains DICOM object types or AIR primitives that the 'live' test partners do not produce.

Instructions

 For AIR IMAGE DISPLAY systems:

  1. Access the test data and load the SRs, and accompanying images, onto your Image Display.  See: https://github.com/IHE/connectathon-artifacts/tree/main/profile_test_data/RAD/AIR
  2. Review requirements in the Connectathon tests listed below
  3. Use the test data in your own lab to prepare to demonstrate those display requirements to a monitor during Connectathon.

>> AIR_Display_Analysis_Result

>> AIR_Display_Parametric_Maps

>> AIR_Display_Segmentation_IOD

>> AIR_Display_*  (etc...)

 

For ALL OTHER AIR ACTORS:

It is OPTIONAL non-Image-Display actors to access the samples, but we recognize the value of test data to all developers, so you are welcome to access the samples.

  1. To access the test data, see: https://github.com/IHE/connectathon-artifacts/tree/main/profile_test_data/RAD/AIR.  Samples are arranged in sub-directories by Connectathon and then by vendor
  2. To download a file in one of the sub-directories, click on the individual file name, then use the links on the right side of the page to download the 'Raw' file.

Evaluation

IMAGE DISPLAY SYSTEMS:  Create a text file that briefly describes your progress in using the SRs with your Image Display. Upload that file into Gazelle Test Management as the result file for test. There is no pass/fail for this preparatory test . We want to make sure you're making progress toward what is expected during evaluation of your Image Display at the Connectathon.