NA Connectathon 2015 Week Resources
Bookmark this page for easy access to resources used to support your Connectathon testing.
- Testing schedule for the week
- Daily
- After-hours access
- Daily 'need to know' announcements
- Seating assignments
- Network information
- Network Description & "I need another fixed IP address!"
- Wireless
- Printer
- Gazelle
- Guidance for Monday's session
- Assigned partners
- XDS, XDS-I, ATNA
- XCA, XCPD, XCA-I
- Ask questions. Get help.
- Tools - location & support
Testing schedule for the week
Daily:
Mon Jan 26, 2015 - 7:30am-5:00pm EST - On-site check-in / badge pickup
Mon Jan 26, 2015 - 8:00am-10:00am - Connectathon test system set-up
Mon Jan 26, 2015 - 10:00am-5:30pm - Connectathon Test Session 1
Tue Jan 27, 2015 - 9:00am-5:30pm - Connectathon Test Session 2
Wed Jan 28, 2015 - 9:00am-5:30pm - Connectathon Test Session 3
Thu Jan 29, 2015 - 9:00am-5:30pm - Connectathon Test Session 4
Fri Jan 30, 2015 - 8:00am - noon - Connectathon Test Session 5 - testing ends promptly at noon
After-hours access:
Participants with a valid badge will have access to the Connectathon Floor...
- mornings starting at 8am on Monday, and at 7am on Tues-Fri
- evenings until 11pm Mon-Thurs. No re-entry is permitted after 9pm. All Participants must leave the test floor at 11pm.
There is no support from volunteer monitors or technical management outside of the daily Testing Sessions; during after-hours, will be preparing for the next day.
Daily 'need to know' announcements
The Connectathon venue makes oral announcements impractical.
Please check your email at 9am and 1:30pm each day. We will send twice-daily "need to know" announcements to the na_connectathon email list.
Seating Assignments
-- Seating assignments - There are two tabs in this spreadsheet. On the first tab, each cell represents one table with two chairs; table locations are identified by a letter/number, eg L28. The second tab shows seating assignments sorted by Organization.
-- Connectathon floor plan
Network Info
- NetworkDescriptionNA2015.pdf: Read the Connectathon Network Description before arriving in Cleveland:
- Please note this extract from this document: New for 2015 -- The network group is not providing small switches at the ends of the sectors. If you are at the end tables of a sector (11, 12, 17, 18, 21, 22, 27, 28 …), you will have to bring a long cable to reach the switch. Each table is 6 feet; you could be 4 tables away from the switch. You could be as far as …… 24 feet, or 8 meters from the switch.
- SSID: NA2015
- Password: cleveland15
- Security type: WPA-MIXED/AES
PLEASE PRINT A TEST PAGE AFTER CONFIGURING THE PRINTER AS FOLLOWS
- 10.242.52.60
- Model: MFC 9970 CDW
- Driver: Brother MFC-9830CDW
Gazelle
Gazelle on-site: http://10.242.100.100/gazelle-na/home.seam
Outside of Connectathon floor, URL remains the same: http://ihe.wustl.edu/gazelle-na/home.seam
Guidance for Monday's session
We hope you've already reviewed the 10 Connectathon Tips from the Pros.
Monday 8-10am is for system set-up. After 10am, we expect you to perform testing. Here is guidance on goals to accomplish during Monday's testing session:
- Configure and connect to tools for your profiles.
- Complete the 5-minute Consistent Time "CT_Client" test
- Content Creators -- submit CDA/C-CDA docs into the samples area of gazelle for evaluation
- Modalities/Evidence Creators -- submit DICOM samples into gazelle and the Central Archive
- Submit media you create to the assigned Monitor --> XDM media (to table G38), PDI media (to table K28)
- It is good practice to had a monitor your media rather than just dropping it at the table.
- Any other tests labeled "*_Do_This_First" or "*_Read_This_First"
- In general, work on other no-peer tests.
- Then, move on to peer-to-peer tests.
Ask questions. Get help:
IHE USA staff - Help desk - Row A
- logistics, "I'm lost", shipping...
Network staff - (J31-J33)
Tool help - see next section
Lynn Felhofer - (M28)
- First & last resource for technical support. Ask me anything.
- ITI, RAD, CARD tests, test requirements & grading
- "I need to drop a profile/actor"
- Gazelle help
Eric Poiseau - (M27)
- LAB, PATH, PHARM tests, test requirements & grading
- Gazelle support
Steve Moore - (H31)
- PCC, QRPH and HealthStory tests, test requirements & grading
- Problems with monitors
Paul Sherman - (J21)
- PCD tests, test requirements & grading
Assigned partners for some profiles
- XDS, XDS-I,ATNA on Tues & Wed: Tue-wed-XDSandATNA-partners.xls (see all 5 tabs in the spreadsheet)
- XCA, XCPD, XCA-I on Tues, Wed, Thurs: XC* Tracking Spreadsheet (several tabs; read the 'Instructions' tab first)
Tools - locations & support
Tools listed below are used to support testing during Connectathon week.
Training material on various tools is here: http://gazelle.ihe.net/training#ToolTraining
Tool errata - as we find issues with tools, we will document them here: https://docs.google.com/document/d/14flrFx47V3OKwzHIhH8TU3DEg09ks9l51041_D0SQNk/pub
Tool | Used for | Location / Config info | Support |
ATNA - Syslog sender / collector / msg browser |
Send, receive, validate audit msgs |
Syslog Msg Browser: http://10.242.100.13/SyslogBrowser-na/index.html Syslog collector ports: there are several ports for UDP and TCP. Please see the approved configurations in gazelle for test system: ARR_IHEUSA_SyslogCollector_2015 |
Ralph (K37) |
ATNA - TLS Tools |
TLS client / server simulator |
||
CDA validation |
APE, BPPC, CRC, CTNN, EDPN, EDR, IC, NN, PHARM*, RCS-C, XD-Lab, XDS-MS, XDS-SD, XPHR-Extract |
|
|
APHP, APS, CRD, HPoC, ENS, LDHP, LDS, NDS, PPOC, PPVS, PRPH-Ca, TN, XPHR-update |
http://cda-validation.nist.gov/cda-validation/validation.html |
Andrew (H34) |
|
C-CDA validation - Lantana Group |
C-CDA HealthStory docs |
Steve (H31) |
|
DICOM Central Archive |
Archive for DICOM objects |
GUI front-end: http://10.242.100.11:18080/dcm4chee-web/ password: admin/admin (to add your AE title so the archive will accept your association) IP addr / port: 10.242.100.11 / 11112 AET: DCM4CHEE |
Steve (H31) |
Gazelle EVS Client |
Home page |
Eric (M27) |
|
DICOM validators (DCCHECK, dcm4che, Dicom3Tools, Pixelmed-REM, dcmcheck) |
Eric (M27) |
||
DSUB validator |
Abderrazek (G36) | ||
HL7v2 validator HL7v3 validator |
Eric (M27) | ||
PDF/A validator (XDS-SD) |
Eric (M27) |
||
WADO validator (XDS-I.b) |
Abderrazek (G36) |
||
XDW validator |
Abderrazek (G36) |
||
Gazelle proxy |
message capture/validation (non-TLS) |
Eric (M27) |
|
Gazelle XDStarClient |
Eric (M27) |
||
HPD tools |
HPD validator |
Abderrazek (G36) |
|
HPD Provider Directory Test Tool - Federation option testing |
Abderrazek (G36) or Eric (M27) | ||
Order Manager simulator |
Send HL7v2 orders |
Abderrazek (G36) or Eric (M27) | |
Patient Generation & Sharing simulator |
Send HL7v2/v3 Patient Registration messages |
Gazelle menu: Connectathon--> Connectathon--> Patient Generation & Sharing |
Abderrazek (G36) or Eric (M27) |
PIX/PDQ tools |
Validate HL7v2/v3 PIX/PDQ msgs |
Rob (J36) |
|
SAML STS |
SAML assertion provider - XUA and SeR testing |
See Massi from Tiani Spirit at table D14 |
|
XDS Tools |
XD* profile testing |
- Endpoints for the XDS Public Registry - Red, Green, and Blue - are on: http://nist1:9080/ - XDS toolkit: http://10.242.43.11:9080/xdstools2/ - XDS Registry Dashboard: from the toolkit home page, select Connectathon Tools --> Dashboard |
Bill (G31) |